What Welfare Facilities Must a Construction Site Provide?
What welfare facilities must a construction site provide? Toilets, washing facilities with hot and cold or warm running water, soap and drying, drinking water, changing rooms and lockers where needed, and a heated rest area with tables, seats with backs and a way to boil water and eat. Schedule 2 of CDM 2015 sets the minimum, and regulations 4(2)(b), 13(4)(c) and 15(11) make clients, principal contractors and every contractor responsible. Welfare must be in place from day one, including on small domestic jobs. Includes a Schedule 2 checklist, a day-one checklist, toilet numbers, mobile sites, domestic work, women on site and enforcement.










